Instruction
Dental pet treat molding machine is special machinery for producing pet snacks and pet chewing toys.
With such machine, various shapes can be made, such as hedgehog, crocodile, dog, bone, pork ears, barrel, etc.
The shapes are very lovely and it is a ideal encouragement to dogs and cats while they learn a new action or do well in some exercises and games.
Also, we can provide different recipes to meet various market demands.
Parameter
Model | DR-268 |
Screw diameter | 60mm |
Screw L/D Ratio | 18.8 |
Short volume | 707mm |
Short Weight | 636g/22.4oz |
Injection pressure | 142Mpa |
Injection rate | 239g/s |
Plasticizing capacity | 49g/s |
Screw speed | 180rpm |
Sample picture
These sample pictures are made by our clients, also the most popular shape that clients prefer. Besides them, other shapes can also be made like pig ear, cap, wheel, frog etc.
Package & Delivery
Darin's pet treat molding machine have been sold to many countries like USA, Mexico, India, Hungary, Czech republic, South Korea, Romania, Thailand etc. Now more and more clients found the big potentional of this machine and came to our factory to see the machinery and discuss the purchase.
Darin provides export standard wooden case, suitable for long terms transportation and multi times loading & unloading by trucks and forklifts.
Main Support Machinery--Pelletizer
DRD-100 Pelletizer is used to make the pellets for molding machine, client can choose the whole line or only extruder as budget.
Flow chart: Flour mixing-screw conveying-extruding-sifting-cooling.
Commissioning & After-sales Service
1. We make accurate factory layout design according to customer’s factory size; if the customer needed, we could make workshop design with electricity power, water supply, gas power, material storage, final storages, worker’s restroom, etc.
2. After delivering machines to client’s factory, we start to apply for the Visa to client’s country immediately; normally the vessel needs 20-60 days to the required port, so we have enough time to get the Visa. While the machines arrives your factory, our engineers are ready to start for the commissioning service.
3. 1-2 of our engineers will go to your factory to install and adjust the processing line to realize normal production at shortest time.
4. Our engineers have responsibility to train and teach the workers how to operate, clean, maintain and repair all the machines, until the workers could well operate the processing line.
5. It normally costs 10 days for the commissioning service, and we supply 1 year guarantee from the date of completion of commissioning service.
6. The engineer’s round-trip flight tickets, accommodation and daily salary USD 100 are on client’s account.